Assembly and Installation Instructions
Step 1: Select a spot approximately 16' from a stationary point to suspend your hammock.
Step 2: Using a post-hole digger or shovel: Dig a hole a minimum of 18 inches in diameter
and 24 to 27 inches in depth. Place the [In Ground Tube] into the hole.
Step 3: Place a small mound of gravel in the center bottom of the hole, this is for drainage and to allow for height adjustment at ground level.
Step 4: Mix concrete (according to manufactures specs)
Fill into hole around the in-ground tube.
A hole of this size will require approximately 3.5 cubic feet of concrete to fill it.
NOTE: You may want to apply a piece of Duct tape over the end of the painted-pole,
to prevent concrete from getting inside of the pole.
Step 5: Fill hole within 2" of tube top and build a slight brim to prevent water corrosion.
Step 6: Insert above ground pole and check to see if it is level in all directions. Remove pole and allow the concrete to set for 24 to 48 hours. This is crucial!
Step 7: The 2 way cap/plug can be used to cap the pole while in use, or cap the ground pole When the pole is not in use. Pole removes quickly for mowing over!
Package Components:
1) Hammock Tube
1) In-Ground Tube
1)Two-Way Cap/Plug
1) "SU" hook
1) Chain
1) Instruction Sheet